Predrilled driven pile

Junttan pile driving rigs can be equipped with an additional side auger to perform predrilling. Predrilling is been used to speed up pile driving process when there is a very hard or dense soil layer covering the foundation site. Using predrilling not only protects the pile from too hard driving, but also efficiently minimizes noise and vibrations.

galleryitem