Junttan

Junttan 45 years
Help Desk & Spare Parts Portal Suppliers

Mostostroy-11 trusts Junttan rigs on their demanding Siberian Projects

28.9.2016

One of the largest bridge-building company in Russia – Mostostroy-11, JSC is involved in construction of the ring highway around Tyumen, Siberia, Russia. Their company branch Mostootryad-36 takes part in piling concrete piles for the newels of future bridge over a river.

Junttan PM25HD with 7t hammer at the ring highway around Tyumen, Siberia, Russia

Junttan PM25HD with 7t hammer at the ring highway around Tyumen, Siberia, Russia

The key numbers of the project:

  • Length of the bridge – 157 m
  • Number of driven piles – 427 pcs
  • Piles size – 400 x 400 mm
  • Piles length – total of 18m (14 +4m)

The precast concrete piles on this project are driven by one of Junttan PM25HD with 7t hammer. The average piling speed is 39 pcs per day.

Junttan equipment received an excellent evaluation from Mostostroy-11 top management. The rigs they own have taken part in all major transport infrastructure projects on the territory of Southwest Siberia and West Siberian plain.

Our Siberian friends are happy with Junttan equipment comments Demis Petridi from Junttan.

For more details, please contact Demis Petridi +7 981 896-37-76 or demis.petridi@junttan.com

 
Contact Us

How can we help you?

  • Technical & manual requests, for faster help, please contact Junttan Service Desk
  • This field is for validation purposes and should be left unchanged.